Felix East Solar
200.92 MW hybrid in Wilbarger, TX · In queue since January 2023 · Proposed COD December 2028
200.92 MW
Capacity
1
Components
Solar
3y 10m
In Queue
IA Executed
IA Phase
Signed Feb 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 1m
IA → COD
3y 10m
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2028-12-31
Projected COD moved
1 time
Jul 2027 → Dec 2028
Net change
+17 months
first report to latest
Capacity
301 → 201 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ERCOT
ercot.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- ercotqueue.com/developer/felix-1-llc
Commercial operation date: LBNL queue shows 2028-12-31 COD, but ERCOT's November 2025 capacity tracking spreadsheet lists Felix East Solar with a 2027 target date. The February 2026 ERCOT tracking maintains 2028. Given IA execution in Feb 2025 and typical 18-24 month construction timelines, 2027 is plausible but evidence is mixed.
Developer: All sources consistently identify Felix 1, LLC as the developer with no evidence of a parent company or operating entity. This appears to be the actual project developer rather than a shell LLC, as it's used across LBNL, ERCOT tracking, and third-party databases.
Status: LBNL shows IA executed on 2025-02-21 with active status. Multiple ERCOT capacity tracking documents from late 2025 and early 2026 confirm the project remains in the pipeline with no indication of withdrawal or construction start.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Felix East Solar project is a proposed 301.44 MW solar generation facility in Wilbarger County, Texas. Developed by Felix 1, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0007, with a queue entry date of January 3, 2023. The proposed commercial operation date is December 31, 2028. The project's interconnection status is currently in the Facility Study phase, and it intends to connect to the 345 kV Riley Substation operated by AEP.
The Felix East Solar project has been the subject of recent news coverage, with four articles categorized under the industry sector.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wilbarger
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Felix 1, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
The 345 kV Riley Substation (#6101); AEP
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ELECTRAW_1_2
- POI Substation
- Riley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.