Briefing on Felix East Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Felix East Solar is a 201 MW Solar+Battery project in Texas, currently active.

Felix 1, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.

Queue ID
ERCOT-27INR0007
Location
Wilbarger, Texas
Technology
Solar+Battery
Developer
Felix 1, LLC
Market / region
ERCOT
Point of interconnection
The 345 kV Riley Substation (#6101); AEP

What stands out

1

Felix East Solar is a 201 MW Solar+Battery project in Texas with status active.

2

Felix 1, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-31.

Market and operating context

Queue date
2023-01-03
Proposed COD
2028-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Felix East Solar — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0007
LocationWilbarger, Texas
TechnologySolar+Battery
DeveloperFelix 1, LLC
Market / regionERCOT
Point of interconnectionThe 345 kV Riley Substation (#6101); AEP
Queue date2023-01-03
Proposed COD2028-12-31