94.2 MW generation in Caldwell, TX · In queue since October 2025 · Proposed COD August 2026
94.2 MW
Capacity
1
Components
Gas
1y 1m
In Queue
IA Executed
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10 months
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2026-08-14
Projected COD moved
0 times
Aug 2026 → Aug 2026
Net change
0 months
first report to latest
Capacity
94 MW
unchanged in the reports
Latest stage
Cancelled
last listed Dec 2025
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Timmerman Power Plant Phase 2B is a proposed 94.2 MW natural gas-fired generation project located in Caldwell County, Texas. The development project is sponsored by the Lower Colorado River Authority and consists of a single gas-fired component totaling 94.2 MW. The project is planned to connect to the grid at the John Dumas 345 kV point of interconnection (designated 7041 John Dumas 345kV).
The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-26INR0735, which it entered on October 21, 2025. Its queue status is active, and an interconnection agreement has been executed. The proposed commercial operation date is August 14, 2026, less than a year after the project entered the queue.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Dec 2025.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Caldwell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lower Colorado River Authority
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7041 John Dumas 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Timmerman Power Plant
Data-driven briefing on Timmerman Power Plant — fleet, generation, financial, and news signals.
Timmerman Power Plant Phase 2B
Data-driven briefing on Timmerman Power Plant Phase 2B — fleet, generation, financial, and news signals.
Lower No 1
Data-driven briefing on Lower Colorado River Authority — fleet, generation, financial, and news signals.
Lower No 2
Data-driven briefing on Lower Colorado River Authority — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.