Roadrunner Crossing Wind (Uprate)
3.3 MW hybrid in Eastland, TX · In queue since December 2025 · Proposed COD June 2027
3.3 MW
Capacity
1
Components
Wind
7 months
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
1y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-06-30
The Roadrunner Crossing Wind (Uprate) project is a proposed 3.3 MW wind generation project located in Eastland County, Texas. Developed by Roadrunner Wind, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0726, with a queue entry date of December 23, 2025. The proposed commercial operation date is December 31, 2026.
The project will interconnect at the 68051 Reata 345kV point of interconnection.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Eastland
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Roadrunner Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
68051 Reata 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Roadrunner Crossing Wind (Uprate)Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.