Greyhound Solar - Phase F (ERCOT-26INR0670) — Project Summary

Queue ID
ERCOT-26INR0670
Capacity
101.6 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR
IA Status
IA Executed

Greyhound Solar - Phase F

ERCOT-26INR0670BetaActiveSolarERCOTLBNL

101.6 MW generation in Ector, TX · In queue since April 2025 · Proposed COD November 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.6 MW

Capacity

1

Components

Solar

1y 7m

In Queue

IA Executed

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7 months

Schedule

12 months past proposed COD

Construction75%
Queue EntryApr 17, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-11-13

Queue history
26INR0670 · 14 monthly ERCOT reports, Apr 2025 – May 2026

Projected COD moved

1 time

Oct 2025 → Nov 2025

Net change

+1 months

first report to latest

Capacity

102 MW

unchanged in the reports

Latest stage

Synchronized

last listed May 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 17, 2025
Facilities study approvedOct 31, 2024
Interconnection agreement signedJan 15, 2022
Approved for energizationAug 14, 2025
Approved for synchronizationSep 10, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 13, 2025
From queue filing
Developer in saved assessment
ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR
From queue filing
Status at research time
Active
Active — IA Executed as of queue filing, no public updates on construction timeline
Financing
Not recorded

Milestones in this assessment

IA executedApr 17, 2025Latest in this assessment

Interconnection Agreement executed per LBNL queue entry

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of November 2025. No independent news or research sources found to validate or contradict this date.

Developer: LBNL filing shows 'ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR' as the developer. The DBA structure suggests Greyhound Solar is the operating brand, but no independent sources found to identify a parent company or confirm corporate structure.

Status: LBNL shows active status with executed interconnection agreement. Proposed COD of November 2025 is imminent but no construction or financing announcements found to validate progress.

About

Saved background

Generated Apr 10, 2026 · Predates May 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Greyhound Solar - Phase F project is a proposed 101.6 MW solar generation project located in Ector County, Texas. The developer is Rockhound Solar 2 LLC DBA Greyhound Solar. It consists of photovoltaic solar technology and is listed as active in the ERCOT interconnection queue under queue ID ERCOT-26INR0670, with a queue entry date of April 17, 2025.

The proposed commercial operation date for Greyhound Solar - Phase F is November 13, 2025. An Interconnection Agreement (IA) was executed on January 15, 2022. The Point of Interconnection (POI) is Tap 345kV 11010 Wolf - 1018 Moss.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: May 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 11010 Wolf - 1018 Moss

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WHCCS2_CC2
POI Substation
Wolf Hollow Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.