Greyhound Solar - Phase F
101.6 MW generation in Ector, TX · In queue since April 2025 · Proposed COD November 2025
101.6 MW
Capacity
1
Components
Solar
1y 7m
In Queue
IA Executed
IA Phase
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7 months
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-11-13
Projected COD moved
1 time
Oct 2025 → Nov 2025
Net change
+1 months
first report to latest
Capacity
102 MW
unchanged in the reports
Latest stage
Synchronized
last listed May 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed per LBNL queue entry
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of November 2025. No independent news or research sources found to validate or contradict this date.
Developer: LBNL filing shows 'ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR' as the developer. The DBA structure suggests Greyhound Solar is the operating brand, but no independent sources found to identify a parent company or confirm corporate structure.
Status: LBNL shows active status with executed interconnection agreement. Proposed COD of November 2025 is imminent but no construction or financing announcements found to validate progress.
About
Generated Apr 10, 2026 · Predates May 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Greyhound Solar - Phase F project is a proposed 101.6 MW solar generation project located in Ector County, Texas. The developer is Rockhound Solar 2 LLC DBA Greyhound Solar. It consists of photovoltaic solar technology and is listed as active in the ERCOT interconnection queue under queue ID ERCOT-26INR0670, with a queue entry date of April 17, 2025.
The proposed commercial operation date for Greyhound Solar - Phase F is November 13, 2025. An Interconnection Agreement (IA) was executed on January 15, 2022. The Point of Interconnection (POI) is Tap 345kV 11010 Wolf - 1018 Moss.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: May 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Ector
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 11010 Wolf - 1018 Moss
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- WHCCS2_CC2
- POI Substation
- Wolf Hollow Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.