Juno 3 Solar
500 MW generation in Borden, TX · In queue since March 2025 · Proposed COD November 2027
500 MW
Capacity
1
Components
Solar
1y 8m
In Queue
IA Executed
IA Phase
Signed Jul 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4 months
IA → COD
2y 4m
Total Duration
4 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2027-11-30
Projected COD moved
0 times
Nov 2027 → Nov 2027
Net change
0 months
first report to latest
Capacity
500 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed for Juno 3 Solar (500 MW, Borden County, TX), per the LBNL/ERCOT queue record.
interconnection.fyiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-26inr0621
- cleanview.co/power-projects/planned/solar-farms/texas/26INR0621/juno-3-solar
- sbenergy.com/project/juno/
- pv-magazine-usa.com/2021/09/01/watch-juno-solar-enters-service-in-texas-with-418-mw-of-capacity/
Commercial operation date: Only the LBNL/ERCOT queue record gives a date (proposed COD 2027-11-30). Cleanview's 'Expected online 2027' and interconnection.fyi's 'proposed completion date is November 30, 2027' appear to be mirrors of that record, not independent signals. No developer press release or news article about Juno 3 specifically was found.
Developer: The LBNL filing entity 'Juno Solar 3' follows the naming of SB Energy's operating 418 MW Juno Solar project in the same county (Borden, TX; sbenergy.com/project/juno). This is an inference: no source names SB Energy as developer of Juno 3 directly, and the news-extracted developer facts describe Juno Solar and the Orion cluster.
Status: The LBNL record shows an active queue entry with an executed IA and is_operational=false. The 2021 'COD achieved' news refers to the original Juno Solar, not Juno 3, so it does not change this status.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Juno 3 Solar project is a proposed 500 MW solar photovoltaic generation project located in Borden County, Texas. Developed by Juno Solar 3, the project is in the ERCOT interconnection queue as entry ERCOT-26INR0621, with a queue entry date of March 24, 2025. An Interconnection Agreement (IA) was executed on July 1, 2025, and the proposed commercial operation date is November 30, 2027. The point of interconnection is #59916 Buck Canyon 345kV.
The Juno 3 Solar project has been the subject of recent news coverage, with five articles categorized as industry news and deal announcements.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Borden
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Juno Solar 3
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#59916 Buck Canyon 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
JUNO SOLAR 3
Data-driven briefing on Juno 3 Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.