Query
JUNO SOLAR 3
Type
Entity Briefing
Entity
Juno 3 Solar
Generated
2026-10-20T02:56:39.547Z

Briefing on Juno 3 Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
500 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-11-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Juno 3 Solar is a 500 MW Solar project in Texas, currently active.

Juno Solar 3 is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-11-30.

Queue ID
ERCOT-26INR0621
Location
Borden, Texas
Technology
Solar
Developer
Juno Solar 3
Market / region
ERCOT
Point of interconnection
#59916 Buck Canyon 345kV

What stands out

1

Juno 3 Solar is a 500 MW Solar project in Texas with status active.

2

Juno Solar 3 is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-11-30.

4

Latest linked story: “SB Energy inaugurates 900MW Texas PV cluster with Google data centre PPA” (PV Tech, 2024-10-21).

Market and operating context

Queue date
2025-03-24
Proposed COD
2027-11-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Juno 3 Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0621
LocationBorden, Texas
TechnologySolar
DeveloperJuno Solar 3
Market / regionERCOT
Point of interconnection#59916 Buck Canyon 345kV
Queue date2025-03-24
Proposed COD2027-11-30