Goat Mountain BESS 2 (ERCOT-26INR0611) — Project Summary

Queue ID
ERCOT-26INR0611
Capacity
100.7 MW
Technology
Wind+Battery
Status
active
Location
Sterling, TX
Region
ERCOT
Developer
Goat Wind LLC
IA Status
Facility Study

Goat Mountain BESS 2

ERCOT-26INR0611BetaActiveBatteryBatteryERCOTLBNL + Live

100.7 MW generation in Sterling, TX · In queue since January 2025 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100.7 MW

Capacity

1

Components

Battery

1y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Queue history
26INR0611 · 21 monthly ERCOT reports, Jan 2025 – Sep 2026

Projected COD moved

2 times

Dec 2026 → Jun 2028

Net change

+18 months

first report to latest

Capacity

103 → 101 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 28, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 1, 2027
Differs from queue: Jun 1, 2028From queue filing
Developer in saved assessment
Goat Wind LLC
From queue filing
Status at research time
Active
Active — Facility Study stage in ERCOT queue, recently filed January 2025
Financing
Not recorded

Milestones in this assessment

IA executedJan 28, 2025Latest in this assessment

Entered ERCOT interconnection queue at Facility Study stage

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2027. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies 'Goat Wind LLC' as developer. No news coverage or corporate announcements found to confirm parent company structure or verify if this is a project SPV versus operating entity.

Status: LBNL shows 'active' status at Facility Study phase with recent queue entry date of January 28, 2025. No contradictory information found in research.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Goat Mountain BESS 2 project is a proposed 100.7 MW hybrid battery energy storage project in Sterling County, Texas. The project, developed by Goat Wind LLC, is interconnected to the ERCOT grid under queue ID ERCOT-26INR0611. It entered the queue on January 28, 2025, with a proposed commercial operation date of June 1, 2027.

The Goat Mountain BESS 2 project is currently listed as active in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Sterling

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Goat Wind LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

76030-Gasconades Creek 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
GOA_GOATWIND
POI Substation
Gasconades Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.