Briefing/projectactive
Goat Mountain BESS 2 is a 101 MW Wind+Battery project in Texas, currently active.
NRG Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-01.
- Queue ID
- ERCOT-26INR0611
- Location
- Sterling, Texas
- Technology
- Wind+Battery
- Developer
- NRG Energy
- Market / region
- ERCOT
- Point of interconnection
- 76030-Gasconades Creek 345 kV
What stands out
1
Goat Mountain BESS 2 is a 101 MW Wind+Battery project in Texas with status active.
2
NRG Energy is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-01.
Market and operating context
- Queue date
- 2025-01-28
- Proposed COD
- 2027-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.