Scorpius Solar (ERCOT-26INR0609) — Project Summary

Queue ID
ERCOT-26INR0609
Capacity
600 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Ben Milam Solar 4
IA Status
Facility Study

Scorpius Solar

ERCOT-26INR0609BetaActiveSolarERCOTLBNL + Live

600 MW generation in Milam, TX · In queue since December 2024 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

600 MW

Capacity

1

Components

Solar

1y 11m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryDec 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-14

Queue history
26INR0609 · 23 monthly ERCOT reports, Nov 2024 – Sep 2026

Projected COD moved

2 times

Oct 2026 → Jun 2029

Net change

+32 months

first report to latest

Capacity

500 → 600 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 16, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 14, 2029
From queue filing
Developer in saved assessment
Ben Milam Solar 4
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no interconnection agreement. No construction, permitting or financing announcements found. ercotqueue.com puts build-chance at 1%.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-26inr0609-scorpius-solar
  2. interconnection.fyi/project/ercot-26inr0609
  3. cleanview.co/power-projects/planned/solar-farms/texas/26INR0609/scorpius-solar
  4. ercotqueue.com/project/26INR0609
  5. app.nrgmap.com/queues/ercot-26inr0609
  6. groundtrace.io/developers/ben-milam-solar-4-7ednickaa2df2

Commercial operation date: Every source that gives a COD (cleanview, infrasure.ai, interconnection.fyi) repeats the LBNL/ERCOT proposed date of June 2029. These are queue-data aggregators, not independent developer signals, so there is no post-LBNL evidence of a different date.

Developer: All sources name Ben Milam Solar 4 as developer, and they appear to derive this from the ERCOT queue. No press release or parent company was found, so the actual operating company can't be identified.

Status: LBNL shows active, and NRG Map confirms active as of Sept 2026. Groundtrace says none of the developer's projects is under construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Scorpius Solar project is a proposed 500 MW solar generation facility located in Milam County, Texas. The project, developed by Ben Milam Solar 4, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0609, with a queue entry date of December 16, 2024. The proposed commercial operation date is June 14, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 500 MW of solar photovoltaic generation. It is planned to interconnect at the 3377 LTPSW 345KV point of interconnection. The Scorpius Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ben Milam Solar 4

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

3377 LTPSW 345KV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.