Fort Worth Power Core Bastrop Gas Plant (ERCOT-26INR0560) — Project Summary

Queue ID
ERCOT-26INR0560
Capacity
506.38 MW
Technology
Gas
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
Fort Worth Power Core LLC
IA Status
Facility Study

Fort Worth Power Core Bastrop Gas Plant

ERCOT-26INR0560BetaActiveGasERCOTLBNL + Live

506.38 MW generation in Bastrop, TX · In queue since May 2025 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

506.38 MW

Capacity

1

Components

Gas

1y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Facilities Study50%
Queue EntryMay 27, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-28

Queue history
26INR0560 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

1 time

Jun 2027 → Sep 2029

Net change

+27 months

first report to latest

Capacity

506 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 27, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 28, 2029
From queue filing
Developer in saved assessment
Fort Worth Power Core LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no interconnection agreement executed. ercotqueue.com lists 'No IA' and a 4% build-chance, and there is no sign of construction or permitting.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0560
  2. infrasure.ai/project/ercot-26inr0560-fort-worth-power-core-bastrop-gas-plant
  3. ercotqueue.com/project/26INR0560
  4. app.nrgmap.com/queues/ercot-26inr0560
  5. kvue.com/video/news/local/bastrop-county-town-hall-proposed-natural-gas-plant-and-date-center/269-bcce4f35-e57e-4bae-ad4e-4785b92525f4

Commercial operation date: Only the ERCOT/LBNL filing date is available. Infrasure and interconnection.fyi both repeat it as the 'Proposed commercial operation date per ERCOT interconnection queue filing', so they are not independent confirmation. No developer press release or news item gives a financing-backed COD.

Developer: Every source that names a developer (ERCOT queue aggregators) repeats the LBNL filing entity 'Fort Worth Power Core LLC'. No parent or operating company was found. A local KVUE town hall story about a proposed gas plant and data center in Bastrop County could not be tied to this project.

Status: LBNL and several aggregators (nrgmap, interconnection.fyi) show 'Active', and the infrasure page says the interconnection agreement is not yet executed. interxdata's 'operational' label conflicts with this and looks like a data error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Fort Worth Power Core Bastrop Gas Plant is a proposed 506.38 MW gas-fired combined-cycle generation project located in Bastrop County, Texas. Developed by Fort Worth Power Core LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0560, with a queue entry date of May 27, 2025, and a proposed commercial operation date of September 28, 2029. The point of interconnection is Tap 345kV 7042 ZORN - 7040 AUSTROP.

This proposed project is linked to the existing Bastrop Energy Center (EIA plant ID 55168).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Fort Worth Power Core LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 7042 ZORN - 7040 AUSTROP

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HAYSEN1_2
POI Substation
Zorn Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.