West Munday Wind
351.91 MW generation in Knox, TX · In queue since November 2024 · Proposed COD August 2029
351.91 MW
Capacity
1
Components
Wind
2 years
In Queue
IA Executed
IA Phase
Signed Jul 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
8 months
IA → COD
4y 1m
Total Duration
8 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2029-08-31
Projected COD moved
2 times
Oct 2026 → Aug 2029
Net change
+34 months
first report to latest
Capacity
352 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT standard generation interconnection agreement between Electric Transmission Texas and Lake Creek Wind, LLC (West Munday Wind) filed with the Texas PUC on 2025-07-22.
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
low confidence at research time
- interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2198
- interconnection.fyi/project/ercot-26inr0531
- infrasure.ai/project/ercot-26inr0531-west-munday-wind
- ercotqueue.com/project/26INR0531
- cleanview.co/power-projects/planned/wind-farms/texas/26INR0531/west-munday-wind
Commercial operation date: Only queue-derived data exists. interconnection.fyi and infrasure.ai both repeat the 2029-08-31 proposed COD, and cleanview.co says 'Expected online 2029'. No developer press release or financing-backed target was found. An infrasure.ai text blurb mentions June 30, 2028, but it contradicts that page's own header and looks like stale aggregator text.
Developer: The LBNL filer Lake Creek Wind, LLC is confirmed as the interconnection customer by the July 2025 Texas PUC filing of the interconnection agreement and by ercotqueue.com. The news-extracted Pattern Energy fact comes from an unrelated staff profile of a facility manager at other sites and does not mention West Munday, so it is not evidence of a parent. infrasure.ai's 'West Munday Wind, LLC' is an aggregator label, not a sourced developer.
Status: LBNL shows IA Executed with an IA date of 2025-07-21. A Texas PUC filing stamped 7/22/2025 covers the ERCOT Standard Generation Interconnection Agreement between Electric Transmission Texas and Lake Creek Wind, LLC for the West Munday Wind Project. Aggregator pages still list the queue entry as active.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The West Munday Wind project is a proposed 351.91 MW wind generation facility in Knox County, Texas. Developed by West Munday Wind, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0531, with a queue entry date of November 19, 2024. The proposed commercial operation date is June 30, 2028. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection for the West Munday Wind project is Tap 345kV 60701 Gauss7B _x0013_ 60712 Quasar. The project has appeared in recent news coverage regarding renewable energy development in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Knox
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lake Creek Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 60703 Gauss7D – 60712 Quasar
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-19
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.