Dove Creek Solar
163.6 MW hybrid in Tom Green, TX · In queue since July 2024 · Proposed COD July 2028
163.6 MW
Capacity
1
Components
Solar
2y 4m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
Projected COD moved
1 time
Jul 2027 → Jul 2028
Net change
+12 months
first report to latest
Capacity
164 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Proposed completion date changed from June 30, 2027 to June 30, 2028
interconnectionfyi.substack.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-26inr0454
- ercotqueue.com/project/26INR0455
- interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
- interconnection.fyi/project/ercot-26inr0455
Commercial operation date: LBNL queue shows proposed COD of July 1, 2028. Interconnection.fyi weekly digest (Dec 2024) confirms the project's completion date was pushed from June 30, 2027 to June 30, 2028, corroborating the LBNL timeline. No contradictory sources found.
Developer: All sources consistently identify 'Dove Creek Solar, LLC' as the developer with no evidence of a parent company or operating entity distinction. No press releases, corporate announcements, or ownership information found in search results.
Status: LBNL shows 'active' status at Facility Study stage. Multiple queue tracking sites confirm active status with no evidence of construction activity, permitting milestones, or financing announcements.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dove Creek Solar is a proposed 163.6 MW solar generation project located in Tom Green County, Texas. The project, developed by Dove Creek Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0454, with a queue entry date of July 22, 2024. The proposed commercial operation date is July 1, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned at a tap on the Big Hill - Twin Buttes 345 kV line (76003 / 76009). The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Tom Green
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Dove Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Big Hill Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.