Dove Creek Solar (ERCOT-26INR0454) — Project Summary

Queue ID
ERCOT-26INR0454
Capacity
163.6 MW
Technology
Solar+Battery
Status
active
Location
Tom Green, TX
Region
ERCOT
Developer
Dove Creek Solar, LLC
IA Status
Facility Study

Dove Creek Solar

ERCOT-26INR0454BetaActiveSolarBatteryERCOTLBNL + Live

163.6 MW hybrid in Tom Green, TX · In queue since July 2024 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

163.6 MW

Capacity

1

Components

Solar

2y 4m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

Queue history
26INR0454 · 27 monthly ERCOT reports, Jul 2024 – Sep 2026

Projected COD moved

1 time

Jul 2027 → Jul 2028

Net change

+12 months

first report to latest

Capacity

164 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jul 1, 2028
From queue filing
Developer in saved assessment
Dove Creek Solar, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no IA executed yet. Companion storage project (26INR0455) also active with same developer.
Financing
Not recorded

Milestones in this assessment

COD targetJul 2028Latest in this assessment

Proposed completion date changed from June 30, 2027 to June 30, 2028

interconnectionfyi.substack.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0454
  2. ercotqueue.com/project/26INR0455
  3. interconnectionfyi.substack.com/p/interconnectionfyi-weekly-digest
  4. interconnection.fyi/project/ercot-26inr0455

Commercial operation date: LBNL queue shows proposed COD of July 1, 2028. Interconnection.fyi weekly digest (Dec 2024) confirms the project's completion date was pushed from June 30, 2027 to June 30, 2028, corroborating the LBNL timeline. No contradictory sources found.

Developer: All sources consistently identify 'Dove Creek Solar, LLC' as the developer with no evidence of a parent company or operating entity distinction. No press releases, corporate announcements, or ownership information found in search results.

Status: LBNL shows 'active' status at Facility Study stage. Multiple queue tracking sites confirm active status with no evidence of construction activity, permitting milestones, or financing announcements.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Dove Creek Solar is a proposed 163.6 MW solar generation project located in Tom Green County, Texas. The project, developed by Dove Creek Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0454, with a queue entry date of July 22, 2024. The proposed commercial operation date is July 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned at a tap on the Big Hill - Twin Buttes 345 kV line (76003 / 76009). The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Tom Green

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Dove Creek Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Big Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.