Query
Dove Creek Solar
Type
Entity Briefing
Entity
Dove Creek Solar
Generated
2026-10-19T14:49:00.446Z

Briefing on Dove Creek Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
164 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Dove Creek Solar is a 164 MW Solar+Battery project in Texas, currently active.

Dove Creek Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-26INR0454
Location
Tom Green, Texas
Technology
Solar+Battery
Developer
Dove Creek Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)

What stands out

1

Dove Creek Solar is a 164 MW Solar+Battery project in Texas with status active.

2

Dove Creek Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2024-07-22
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Dove Creek Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0454
LocationTom Green, Texas
TechnologySolar+Battery
DeveloperDove Creek Solar, LLC
Market / regionERCOT
Point of interconnectionTap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)
Queue date2024-07-22
Proposed COD2028-07-01