Big Rooter West Solar
403.42 MW hybrid in Robertson, TX · In queue since March 2024 · Proposed COD May 2028
403.42 MW
Capacity
1
Components
Solar
2y 8m
In Queue
IA Executed
IA Phase
Signed Feb 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
11 months
IA → COD
3y 3m
Total Duration
11 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 18–30 months
Proposed COD: 2028-05-31
Projected COD moved
3 times
Dec 2026 → May 2028
Net change
+17 months
first report to latest
Capacity
403 → 403 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement signed Feb 2025, consistent with the LBNL snapshot (IA date 2025-02-18).
infrasure.aiPanamint Capital broke ground on the $1.7B Big Rooter Power project. Phase 1 (Big Rooter West, 491 MWdc) is under construction.
texaspolitics.comCommercial operations for Big Rooter West are targeted for August 2028. Phase 2 (Big Rooter East) is targeted for August 2029.
texaspolitics.comResearch sources and reasoning (4 recorded sources)
high confidence at research time
- texaspolitics.com/2026/07/24/panamint-breaks-ground-on-1-7-billion-texas-solar-project-at-former-coal-site/
- panamintcapital.com/portfolio/redevelopment/
- kbtx.com/2026/07/30/massive-17b-solar-project-breaks-ground-robertson-county/
- infrasure.ai/project/ercot-26inr0431-big-rooter-west-solar
Commercial operation date: Panamint's groundbreaking coverage says Big Rooter West (phase 1) is under construction with commercial operations expected in August 2028. That is about 3 months after the LBNL date of 2028-05-31, and Panamint's portfolio page also says 2028. Only the year is stated as consensus because no day is given.
Developer: The LBNL filer 'Big Rooter West, LLC' is a project LLC. Panamint Capital announced groundbreaking on Big Rooter Power, whose first phase is named 'Big Rooter West', at its Twin Oaks site in Robertson County. The shared project name and location link the LLC to Panamint, but no source states the ownership link explicitly.
Status: The July 2026 Panamint announcement and KBTX coverage report that construction on the first phase has begun. This moves the project past the LBNL queue status of Active.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Big Rooter West Solar SLF is a proposed solar generation project located in Robertson County, Texas, with a total capacity of 403.42 MW. Developed by Big Rooter West, LLC, the project consists entirely of solar photovoltaic generation.
The project is currently in the ERCOT interconnection queue as entry ERCOT-26INR0431, with a queue entry date of March 22, 2024. Its proposed commercial operation date is May 31, 2028, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is listed as 39950# TNTNP_ONE_3 345 KV. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Robertson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Big Rooter West, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
39950# TNTNP_ONE_3 345 KV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.