Twinwood Solar 1
358.06 MW generation in Waller, TX · In queue since March 2024 · Proposed COD February 2029
358.06 MW
Capacity
1
Components
Solar
2y 8m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-02-01
Projected COD moved
2 times
May 2027 → Feb 2029
Net change
+21 months
first report to latest
Capacity
383 → 358 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-26inr0425-twinwood-solar-1
- cleanview.co/power-projects/planned/solar-farms/texas/26INR0425/twinwood-solar-1
- interconnection.fyi/project/ercot-26inr0425
- ercotqueue.com/project/26INR0425
- app.nrgmap.com/queues/ercot-26inr0425
- ercotqueue.com/developer/twinwood-pv1-llc
Commercial operation date: Infrasure lists 'Proposed COD: 2027-10-27' and Cleanview says 'Expected online 2027', both later than the LBNL date of 2029-02-01. Both are queue aggregators rather than developer announcements, and interconnection.fyi still shows 2029-02-01, so the evidence is thin.
Developer: Every source names Twinwood PV1, LLC, which looks like a project shell. No press release or news item identifies a parent or operating company. The Waller County Elin Energy articles are about an unrelated panel factory.
Status: Infrasure, interconnection.fyi, ercotqueue.com and NRG Map all show the project as active, with the Facility Study and IA pending. One aggregator (interxdata) says 'operational', which contradicts the others and the queue data, so I treated it as an error.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Twinwood Solar 1 is a proposed solar generation project located in Waller County, Texas, within the ERCOT region. The project, developed by Twinwood PV1, LLC, has a total capacity of 358.06 MW. It consists entirely of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0425, with a queue entry date of March 22, 2024. The proposed commercial operation date is October 27, 2027. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Waller
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Twinwood PV1, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.