Whitetail BESS (ERCOT-26INR0420) — Project Summary

Queue ID
ERCOT-26INR0420
Capacity
180 MW
Technology
Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Hunt Energy Network, LLC
IA Status
Facility Study

Whitetail BESS

ERCOT-26INR0420BetaActiveBatteryERCOTLBNL + Live

180 MW storage in Mitchell, TX · In queue since February 2024 · Proposed COD June 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

180 MW

Capacity

1

Components

Battery

2y 9m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 4m

Facilities Study50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-08

Queue history
26INR0420 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

3 times

Dec 2026 → Jun 2029

Net change

+30 months

first report to latest

Capacity

180 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 27, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 8, 2029
From queue filing
Developer in saved assessment
Hunt Energy Network, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, no IA executed. Early-stage project with 5% build probability per queue analytics.
Financing
Not recorded

Milestones in this assessment

IA executedFeb 27, 2024Latest in this assessment

Project entered ERCOT queue as 26INR0420

cleanview.co
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0420/whitetail-bess
  2. ercotqueue.com/project/26INR0420
  3. ercotqueue.com/developer/hunt-energy-network-llc
  4. images1.showcase.com/d2/-0De-RO-jQonkpQ2jP1NIhlV4X4KhA7CUOhUCTtJjTw/document.pdf

Commercial operation date: Only source for COD is the LBNL queue snapshot showing June 2029. No press releases, financing announcements, or developer statements found to validate or update this date.

Developer: Hunt Energy Network, LLC appears consistently across all sources as both the filing entity and operating company. No evidence of shell-LLC structure or parent company differentiation found.

Status: LBNL shows 'active' status at Facility Study stage with no IA date. Third-party queue trackers confirm active status with low build-chance given early interconnection stage.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Whitetail BESS is a proposed 180 MW battery energy storage development project located in Mitchell County, Texas. The project is being developed by Hunt Energy Network, LLC and consists of a single battery storage component with a capacity of 180 MW. It is planned to connect to the grid at the #23846 SALTMN_SU8 138kV point of interconnection.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-26INR0420. It entered the queue on February 27, 2024, and currently holds an active status. The project is in the Facility Study phase of the interconnection process and has not yet reached an interconnection agreement. Its proposed commercial operation date is June 8, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hunt Energy Network, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

#23846 SALTMN_SU8 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.