Query
Whitetail BESS
Type
Entity Briefing
Entity
Whitetail BESS
State
TN
Technology
battery
Generated
2026-10-20T04:29:12.169Z

Briefing on Whitetail BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
180 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-06-08
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Whitetail BESS is a 180 MW Battery project in Texas, currently active.

Hunt Energy Network, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-08.

Queue ID
ERCOT-26INR0420
Location
Mitchell, Texas
Technology
Battery
Developer
Hunt Energy Network, LLC
Market / region
ERCOT
Point of interconnection
#23846 SALTMN_SU8 138kV

What stands out

1

Whitetail BESS is a 180 MW Battery project in Texas with status active.

2

Hunt Energy Network, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-08.

Market and operating context

Queue date
2024-02-27
Proposed COD
2029-06-08
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Whitetail BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0420
LocationMitchell, Texas
TechnologyBattery
DeveloperHunt Energy Network, LLC
Market / regionERCOT
Point of interconnection#23846 SALTMN_SU8 138kV
Queue date2024-02-27
Proposed COD2029-06-08