TE Smith Storage 2
125.32 MW storage in Rockwall, TX · In queue since April 2024 · Proposed COD February 2029
125.32 MW
Capacity
1
Components
Battery
2y 7m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-02-07
Projected COD moved
2 times
Jul 2026 → Feb 2029
Net change
+31 months
first report to latest
Capacity
125 → 125 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Facility Study stage — no IA executed as of queue snapshot
cleanview.coResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0418/te-smith-storage-2
- renewablesinfo.org/project/ercot-26inr0418-te-smith-storage-2
- ercotqueue.com/project/26INR0418
- cleanview.co/power-projects/developers/tesla
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-08-16. No independent news sources or press releases found to confirm or contradict this date. Multiple aggregator sites (Cleanview, renewablesinfo.org, ercotqueue.com) echo the LBNL data but provide no original reporting.
Developer: LBNL filing entity is 'Smith II Battery Storage, LLC' (project shell). Cleanview's Tesla developer page lists 'TE Smith Storage 2' as a 125 MW battery project in Tesla's pipeline, indicating Tesla is the parent/operating company behind the shell LLC.
Status: LBNL status is 'active' at Facility Study stage with no IA date. No news of construction activity, financing, or withdrawal. Status reflects early interconnection process.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The TE Smith Storage 2 project is a proposed 125.36 MW battery storage project located in Rockwall County, Texas. Developed by Smith II Battery Storage, LLC, the project entered the ERCOT interconnection queue on April 15, 2024, with queue ID ERCOT-26INR0418. The proposed commercial operation date is August 16, 2027.
The project's interconnection status is currently in the Facility Study phase. It is designed as a standalone battery storage facility, with the entire 125.36 MW capacity attributed to battery technology. The point of interconnection is the 2483 Royse 345kV substation. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Rockwall
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Smith II Battery Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
2478 Royse 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- V2_DGR1_RN
- POI Substation
- Royse Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TE Smith Storage 2
Data-driven briefing on TE Smith Storage 2 — fleet, generation, financial, and news signals.
TE Smith Storage
Data-driven briefing on TE Smith Storage — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.