Briefing on TE Smith Storage 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
125 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-08-16
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

TE Smith Storage 2 is a 125 MW Battery project in Texas, currently active.

Smith II Battery Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-16.

Queue ID
ERCOT-26INR0418
Location
Rockwall, Texas
Technology
Battery
Developer
Smith II Battery Storage, LLC
Market / region
ERCOT
Point of interconnection
2478 Royse 345kV

What stands out

1

TE Smith Storage 2 is a 125 MW Battery project in Texas with status active.

2

Smith II Battery Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-08-16.

Market and operating context

Queue date
2024-04-15
Proposed COD
2027-08-16
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

TE Smith Storage 2 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0418
LocationRockwall, Texas
TechnologyBattery
DeveloperSmith II Battery Storage, LLC
Market / regionERCOT
Point of interconnection2478 Royse 345kV
Queue date2024-04-15
Proposed COD2027-08-16