Kodiak AGR1
132 MW generation in Reeves, TX · In queue since February 2024 · Proposed COD June 2029
132 MW
Capacity
1
Components
Oil
2y 9m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-08
Projected COD moved
1 time
Jun 2027 → Jun 2029
Net change
+24 months
first report to latest
Capacity
132 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
TCEQ Electric Generating Unit Standard Permit Technical Review initiated for Kodiak Generation, LLC
records.tceq.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- gem.wiki/Kodiak_AGR1_power_plant
- interchange.puc.texas.gov/Documents/59182_173_1591794.PDF
- interconnection.fyi/project/ercot-26inr0396
- oilandgaswatch.org/facility/rec_d3dtq407l7g4fps53db0
- records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8286670&Rendition=Web
Commercial operation date: LBNL queue snapshot shows proposed COD of June 15, 2027. No independent news sources provide alternative dates; all search results simply echo the LBNL filing data.
Developer: LBNL filing entity 'Hunt Energy Network, LLC' appears to be the operating company itself, not a project shell LLC. No evidence of parent company or ownership structure in search results.
Status: LBNL shows 'active' status at Facility Study stage. TCEQ technical review document from October 2024 confirms active permitting process for 40-engine diesel facility.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Kodiak AGR1 (TEF- Due Diligence) project is a proposed 132 MW oil-fired generation project located in Reeves County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0396. Its proposed commercial operation date is June 15, 2027.
The project is currently listed as active in the interconnection queue. No developer is specified in the available data. The project has appeared in recent news coverage regarding power projects in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Reeves
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hunt Energy Network, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
38113 TNCOYOTSPG1
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.