Briefing on Kodiak AGR1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
132 MW
Proposed capacity
active
Current status
Other
Technology
ERCOT
Market / region
2027-06-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Kodiak AGR1 is a 132 MW Other project in Texas, currently active.

Hunt Energy Network, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-15.

Queue ID
ERCOT-26INR0396
Location
Reeves, Texas
Technology
Other
Developer
Hunt Energy Network, LLC
Market / region
ERCOT
Point of interconnection
38113 TNCOYOTSPG1

What stands out

1

Kodiak AGR1 is a 132 MW Other project in Texas with status active.

2

Hunt Energy Network, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-15.

Market and operating context

Queue date
2024-02-27
Proposed COD
2027-06-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Kodiak AGR1 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0396
LocationReeves, Texas
TechnologyOther
DeveloperHunt Energy Network, LLC
Market / regionERCOT
Point of interconnection38113 TNCOYOTSPG1
Queue date2024-02-27
Proposed COD2027-06-15