Zeus Spade BESS (ERCOT-26INR0387) — Project Summary

Queue ID
ERCOT-26INR0387
Capacity
446.3 MW
Technology
Wind+Battery
Status
active
Location
Mitchell, TX
Region
ERCOT
Developer
Spade BESS
IA Status
Facility Study

Zeus Spade BESS

ERCOT-26INR0387BetaActiveBatteryBatteryERCOTLBNL + Live

446.3 MW generation in Mitchell, TX · In queue since March 2024 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

446.3 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryMar 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-20

Queue history
26INR0387 · 20 monthly ERCOT reports, Feb 2025 – Sep 2026

Projected COD moved

1 time

Mar 2027 → Mar 2028

Net change

+12 months

first report to latest

Capacity

446 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 29, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 20, 2028
From queue filing
Developer in saved assessment
Spade BESS
From queue filing
Status at research time
Active
Active in the ERCOT queue at Facility Study stage with no IA date. ercotqueue.com labels it 'Construction', but that is an unverified tracker label with no corroborating groundbreaking news.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-26inr0387
  2. app.nrgmap.com/queues/ercot-26inr0387
  3. ercotqueue.com/project/26INR0387

Commercial operation date: Only the LBNL/ERCOT queue date is available. interconnection.fyi repeats it as a proposed completion date of March 20, 2028, so it is not an independent signal. No press release or news article gives a developer-backed COD.

Developer: LBNL, interconnection.fyi and ercotqueue.com all list 'Spade BESS' as the developer. No source names a parent or operating company behind this project-style entity, so it cannot be resolved further. The Zeus search results were about unrelated topics.

Status: LBNL shows active status with IA status 'Facility Study' and no executed IA. NRG Map also shows active. The single 'Construction' label from ercotqueue.com is not supported by any news or developer announcement.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Zeus Spade BESS (queue ID ERCOT-26INR0387) is a proposed battery energy storage development project in Mitchell County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The developer is listed as Spade BESS. The project has a total capacity of 446.3 MW. Although its technology is classified as Wind+Battery in the queue data, the only component specified is a 446.3 MW battery storage system. It would connect to the grid through a tap on the 345 kV line between the Morgan Creek (1030) and Gasconades Creek (76030) substations.

The project entered the ERCOT interconnection queue on March 29, 2024, and its queue status is active. It is in the Facility Study phase of the interconnection process and has not yet reached an executed interconnection agreement. The proposed commercial operation date is March 20, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Mitchell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Spade BESS

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.