Briefing on Zeus Spade BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
446 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
ERCOT
Market / region
2027-03-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Zeus Spade BESS is a 446 MW Wind+Battery project in Texas, currently active.

Spade BESS is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-20.

Queue ID
ERCOT-26INR0387
Location
Mitchell, Texas
Technology
Wind+Battery
Developer
Spade BESS
Market / region
ERCOT
Point of interconnection
Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek

What stands out

1

Zeus Spade BESS is a 446 MW Wind+Battery project in Texas with status active.

2

Spade BESS is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-03-20.

Market and operating context

Queue date
2024-03-29
Proposed COD
2027-03-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Zeus Spade BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0387
LocationMitchell, Texas
TechnologyWind+Battery
DeveloperSpade BESS
Market / regionERCOT
Point of interconnectionTap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek
Queue date2024-03-29
Proposed COD2027-03-20