Cobra Clean Energy Center
100.4 MW storage in Brazoria, TX · In queue since February 2024 · Proposed COD October 2027
100.4 MW
Capacity
1
Components
Battery
2y 9m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-08
Projected COD moved
1 time
Jan 2028 → Oct 2027
Net change
-3 months
first report to latest
Capacity
100 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Project entered ERCOT queue at Facility Study stage
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0374/cobra-clean-energy-center
- cleanview.co/power-projects/developers/on-energy
- interconnection.fyi/project/ercot-26inr0374
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
Commercial operation date: Only LBNL queue snapshot provides a COD of 2027-10-08. No press releases, news articles, or developer announcements found to confirm or update this target date.
Developer: LBNL filing entity is 'Cobra Clean Energy Center LLC' (project-specific shell). Cleanview aggregator lists this project under 'On Energy's Projects and Development Pipeline', indicating On Energy is the parent developer/operator.
Status: LBNL status is 'active' with IA status at 'Facility Study'. No news or press releases found indicating construction start, financing close, or status changes.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Cobra Clean Energy Center is a proposed 100.4 MW battery storage project located in Brazoria County, Texas. Developed by Cobra Clean Energy Center LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0374, with a queue entry date of February 2, 2024.
The proposed commercial operation date for the Cobra Clean Energy Center is October 8, 2027. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is planned to be looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100).
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cobra Clean Energy Center LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Cobra Clean Energy Center
Data-driven briefing on Cobra Clean Energy Center — fleet, generation, financial, and news signals.
Energy Center
Data-driven briefing on Energy Center — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.