Briefing/projectactive
Cobra Clean Energy Center is a 100 MW Battery project in Texas, currently active.
Cobra Clean Energy Center LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-08.
- Queue ID
- ERCOT-26INR0374
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- Cobra Clean Energy Center LLC
- Market / region
- ERCOT
- Point of interconnection
- looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)
What stands out
1
Cobra Clean Energy Center is a 100 MW Battery project in Texas with status active.
2
Cobra Clean Energy Center LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-10-08.
Market and operating context
- Queue date
- 2024-02-02
- Proposed COD
- 2027-10-08
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.