Briefing on Cobra Clean Energy Center

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-08
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Cobra Clean Energy Center is a 100 MW Battery project in Texas, currently active.

Cobra Clean Energy Center LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-08.

Queue ID
ERCOT-26INR0374
Location
Brazoria, Texas
Technology
Battery
Developer
Cobra Clean Energy Center LLC
Market / region
ERCOT
Point of interconnection
looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)

What stands out

1

Cobra Clean Energy Center is a 100 MW Battery project in Texas with status active.

2

Cobra Clean Energy Center LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-08.

Market and operating context

Queue date
2024-02-02
Proposed COD
2027-10-08
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Cobra Clean Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0374
LocationBrazoria, Texas
TechnologyBattery
DeveloperCobra Clean Energy Center LLC
Market / regionERCOT
Point of interconnectionlooped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)
Queue date2024-02-02
Proposed COD2027-10-08