ARTIO ENERGY STORAGE (ERCOT-26INR0349) — Project Summary

Queue ID
ERCOT-26INR0349
Capacity
205.94 MW
Technology
Battery
Status
active
Location
Collin, TX
Region
ERCOT
Developer
Artio Energy Storage LLC
IA Status
Facility Study

ARTIO ENERGY STORAGE

ERCOT-26INR0349BetaActiveBatteryERCOTLBNL

205.94 MW storage in Collin, TX · In queue since November 2023 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.94 MW

Capacity

1

Components

Battery

3 years

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryNov 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-01

Queue history
26INR0349 · 30 monthly ERCOT reports, Oct 2023 – Mar 2026

Projected COD moved

1 time

Oct 2026 → Oct 2028

Net change

+24 months

first report to latest

Capacity

208 → 206 MW

changed in the reports

Latest stage

Cancelled

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 14, 2023
Facilities study approvedMar 5, 2025
CancelledApr 9, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2028
From queue filing
Developer in saved assessment
Artio Energy Storage LLC
From queue filing
Status at research time
Withdrawn
Withdrawn — interconnection.fyi lists project status as 'Withdrawn' despite LBNL showing 'Active' in Facility Study phase
Financing
Not recorded

Milestones in this assessment

WithdrawnLatest in this assessment

Project listed as Withdrawn in Texas interconnection queue tracking

interconnection.fyi
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interconnection.fyi/projects/state/TX
  2. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  3. cleanview.co/planned-battery-projects/TX/26INR0349/artio-energy-storage

Commercial operation date: Only LBNL queue snapshot provides a COD of 2028-10-01. No news sources or press releases mention project-specific timelines or milestones for Artio Energy Storage.

Developer: Only LBNL identifies the developer as 'Artio Energy Storage LLC'. No news coverage or corporate announcements found to confirm parent company or operating entity structure.

Status: interconnection.fyi database explicitly lists ARTIO ENERGY STORAGE (26INR0349) in Collin County as 'Withdrawn', contradicting LBNL's 'Active' status. LBNL snapshot may be stale.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Artio Energy Storage project is a proposed 205.94 MW battery storage project located in Collin County, Texas. Developed by Artio Energy Storage LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0349, with a queue entry date of November 14, 2023. The project's proposed commercial operation date is October 1, 2028, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists solely of battery storage, with a total capacity of 205.94 MW. The point of interconnection is the Farmersville 345kV Substation (PSSE BUS # 1685). The Artio Energy Storage project has appeared in recent news coverage regarding energy storage developments in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Collin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Artio Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Farmersville 345kV Substation (PSSE BUS # 1685)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FRMR_BS2_RN1
POI Substation
Farmersville Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.