Briefing on ARTIO ENERGY STORAGE

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
206 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

ARTIO ENERGY STORAGE is a 206 MW Battery project in Texas, currently active.

Artio Energy Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-01.

Queue ID
ERCOT-26INR0349
Location
Collin, Texas
Technology
Battery
Developer
Artio Energy Storage LLC
Market / region
ERCOT
Point of interconnection
Farmersville 345kV Substation (PSSE BUS # 1685)

What stands out

1

ARTIO ENERGY STORAGE is a 206 MW Battery project in Texas with status active.

2

Artio Energy Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-01.

Market and operating context

Queue date
2023-11-14
Proposed COD
2028-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ARTIO ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0349
LocationCollin, Texas
TechnologyBattery
DeveloperArtio Energy Storage LLC
Market / regionERCOT
Point of interconnectionFarmersville 345kV Substation (PSSE BUS # 1685)
Queue date2023-11-14
Proposed COD2028-10-01