Salt-Lick Solar (ERCOT-26INR0277) — Project Summary

Queue ID
ERCOT-26INR0277
Capacity
453 MW
Technology
Solar+Battery
Status
active
Location
Culberson, TX
Region
ERCOT
Developer
Salt-Lick Solar, LLC
IA Status
Facility Study

Salt-Lick Solar

ERCOT-26INR0277BetaActiveSolarBatteryERCOTLBNL

453 MW hybrid in Culberson, TX · In queue since October 2023 · Proposed COD June 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

453 MW

Capacity

1

Components

Solar

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 8m

Facilities Study50%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Queue history
26INR0277 · 34 monthly ERCOT reports, Oct 2023 – Jul 2026

Projected COD moved

2 times

Dec 2026 → Jun 2028

Net change

+18 months

first report to latest

Capacity

510 → 453 MW

changed in the reports

Latest stage

Cancelled

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 13, 2023
CancelledAug 19, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2028
From queue filing
Developer in saved assessment
Salt-Lick Solar, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study phase with no interconnection agreement executed. Interconnection.fyi lists it as withdrawn, which conflicts with LBNL and the other trackers.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/26INR0277/salt-lick-solar
  2. interconnection.fyi/project/ercot-26inr0277
  3. infrasure.ai/project/ercot-26inr0277-salt-lick-solar
  4. ercotqueue.com/developer/salt-lick-solar-llc

Commercial operation date: The LBNL proposed COD is 2028-06-01. Cleanview ('Expected online 2028') and Infrasure ('proposed commercial operation date is June 1, 2028') repeat the same date, but both look derived from the queue data, so there is no independent developer or press-release target.

Developer: No press release or news names an operating parent. An Infrasure line says the project 'entered ERCOT queue as Salt Lick Solar Park LLC under EDPR ownership'. It is a single aggregator claim with no date or supporting source, and the same page gives 510 MW instead of 453 MW, so I did not treat it as a confirmed parent or ownership change.

Status: LBNL, Infrasure and ercotqueue.com (1 active, 0 dropped for this developer) all show the project as active. Only interconnection.fyi says withdrawn, and I could not corroborate that, so I kept LBNL's status.

About

Saved background

Generated Apr 10, 2026 · Predates Jul 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Salt-Lick Solar is a proposed 510 MW solar generation project located in Culberson County, Texas. The project, developed by Salt-Lick Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-26INR0277, with a queue entry date of October 13, 2023. The proposed commercial operation date is June 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The Salt-Lick Solar development has been the subject of recent news coverage, with three articles focusing on deals related to the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Culberson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Salt-Lick Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Elcor_8 bus # 11198

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.