Operation Sunshine (ERCOT-26INR0255) — Project Summary

Queue ID
ERCOT-26INR0255
Capacity
603.2 MW
Technology
Solar+Battery
Status
active
Location
Concho, TX
Region
ERCOT
Developer
Duck Creek Solar, LLC
IA Status
IA Executed

Operation Sunshine

ERCOT-26INR0255BetaActiveSolarBatteryERCOTLBNL + Live

603.2 MW hybrid in Concho, TX · In queue since November 2023 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

603.2 MW

Capacity

1

Components

Solar

3 years

In Queue

IA Executed

IA Phase

Signed Aug 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 9m

IA → COD

3y 8m

Total Duration

1y 9m

Construction75%
Queue EntryNov 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 27, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-04-01

Queue history
26INR0255 · 34 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

3 times

Jul 2026 → Apr 2029

Net change

+33 months

first report to latest

Capacity

602 → 603 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 14, 2023
Interconnection agreement signedAug 27, 2025
On ERCOT's inactive listJul 2026 – Jul 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Mar 12, 2028
Differs from queue: Apr 1, 2029
Developer in saved assessment
Duck Creek Solar, LLC
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue with an interconnection agreement executed in Aug 2025; no public evidence of construction start or financing close.
Financing
Not recorded

Milestones in this assessment

IA executedAug 27, 2025Latest in this assessment

Interconnection agreement executed for the 603 MW Operation Sunshine solar+battery project (LBNL date; Infrasure confirms an Aug 2025 signing).

infrasure.ai
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-26inr0255-operation-sunshine
  2. cleanview.co/planned-solar-projects/TX/26INR0255/operation-sunshine
  3. cleanview.co/power-projects/planned/solar-farms/texas/26INR0255/operation-sunshine

Commercial operation date: Infrasure lists 'Proposed COD: 2028-03-12' for ERCOT-26INR0255, and Cleanview says 'expected to come online in March 2028'. Both are about a year earlier than the LBNL date of 2029-04-01. Both are queue aggregators, probably drawing on the same ERCOT data, and a second Cleanview page still says 2029, so this is weak evidence.

Developer: LBNL and Infrasure both name Duck Creek Solar, LLC, a project-level entity, and no source identifies a parent or operating company. The news-extracted facts (Ørsted, Energy Capital Partners, Helena Energy Center, 518 MW, online) describe a different project and were discarded.

Status: LBNL reports an active status with IA Executed (2025-08-27), and Infrasure confirms an IA signed in Aug 2025. The Infrasure page also says 'Facility Study phase', which conflicts with that and was not used. No source shows construction or operation.

Project lifecycle
as of 2025-05-22
PhaseOnlineNS Energy · 2025-05-22
OperationalYesNS Energy · 2025-05-22
TechnologyHybridNS Energy · 2025-05-22
DeveloperØrstedNS Energy · 2025-05-22
GroundbreakingAnnouncedNS Energy · 2025-05-22
COD achievedReportedNS Energy · 2025-05-22

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Operation Sunshine is a proposed 602.1 MW solar generation project located in Concho County, Texas. The project, developed by Duck Creek Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0255, with a queue entry date of November 14, 2023. The proposed commercial operation date is March 12, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 602.1 MW of solar generation capacity. Operation Sunshine has been the subject of recent news coverage, with three articles categorized as industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Concho

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Duck Creek Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

7077 Amos Creek 345kV

Data Source

LBNL + Live

PartnerEnergy Capital PartnersNS Energy · 2025-05-22
CompanyØrstedNS Energy · 2025-05-22
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-14

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.