Goldfinch Storage
100.44 MW generation in Van Zandt, TX · In queue since October 2023 · Proposed COD March 2030
100.44 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-03-31
Projected COD moved
4 times
Sep 2026 → Mar 2030
Net change
+42 months
first report to latest
Capacity
100 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
COD target updated from August 2027 to March 2028
facebook.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- facebook.com/groups/savevzcounty/posts/1750181605586046/
- cleanview.co/planned-battery-projects/TX/26INR0254/goldfinch-storage
- interconnection.fyi/project/ercot-26inr0254
- ercotqueue.com/project/26INR0254
Commercial operation date: Facebook community post from July 2025 states 'Goldfinch Storage projects have moved from August 2027 to March 2028,' indicating a developer-announced target. Cleanview also lists March 2028. LBNL's 2030-03-31 appears to be a conservative placeholder.
Developer: All sources consistently reference 'BT DJ4M Solar, LLC' as the developer. No parent company or operating entity identified in search results. Entity appears to be the actual developer rather than a shell LLC.
Status: LBNL shows 'active' status in Facility Study phase. Facebook community monitoring confirms project remains active with updated timeline discussions as of July 2025.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Goldfinch Storage is a proposed 100.44 MW battery storage project located in Van Zandt County, Texas. The development project, sponsored by BT DJ4M Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0254, with a queue entry date of October 4, 2023. The proposed commercial operation date is March 18, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is listed as Tap Connection Bus 2485 Poetry Switch _x0013_ 3223 Shamburger Switch.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Van Zandt
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BT DJ4M Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.