Briefing on Goldfinch Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2030-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Goldfinch Storage is a 100 MW Solar+Battery project in Texas, currently active.

BT DJ4M Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-03-31.

Queue ID
ERCOT-26INR0254
Location
Van Zandt, Texas
Technology
Solar+Battery
Developer
BT DJ4M Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch

What stands out

1

Goldfinch Storage is a 100 MW Solar+Battery project in Texas with status active.

2

BT DJ4M Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-03-31.

Market and operating context

Queue date
2023-10-04
Proposed COD
2030-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Goldfinch Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0254
LocationVan Zandt, Texas
TechnologySolar+Battery
DeveloperBT DJ4M Solar, LLC
Market / regionERCOT
Point of interconnectionTap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch
Queue date2023-10-04
Proposed COD2030-03-31