Skipjack Energy Storage (ERCOT-26INR0189) — Project Summary

Queue ID
ERCOT-26INR0189
Capacity
150.6 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Skipper Energy Storage LLC
IA Status
IA Executed

Skipjack Energy Storage

ERCOT-26INR0189BetaActiveBatteryERCOTLBNL + Live

150.6 MW storage in Brazoria, TX · In queue since July 2023 · Proposed COD February 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.6 MW

Capacity

1

Components

Battery

3y 4m

In Queue

IA Executed

IA Phase

Signed Aug 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 1m

IA → COD

3y 6m

Total Duration

1y 1m

Construction75%
Queue EntryJul 31, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 13, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-02-28

Queue history
26INR0189 · 39 monthly ERCOT reports, Jul 2023 – Sep 2026

Projected COD moved

2 times

Aug 2026 → Feb 2028

Net change

+18 months

first report to latest

Capacity

151 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 31, 2023
Interconnection agreement signedAug 13, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: Feb 28, 2028
Developer in saved assessment
esVolta
Filed as Skipper Energy Storage LLC
Status at research time
IA Executed
IA Executed — interconnection agreement signed August 2024, FIS (Facility Interconnection Study) pending per ERCOT queue tracker
Financing
Not recorded

Milestones in this assessment

IA executedAug 13, 2024

Interconnection Agreement executed with ERCOT transmission providers

interchange.puc.texas.gov
COD target2027Latest in this assessment

ERCOT November 2024 capacity chart lists 2027 commercial operation target

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. ercot.com/files/docs/2024/12/06/Capacity%20Changes%20by%20Fuel%20Type%20Charts_November_2024.xlsx
  2. cleanview.co/power-projects/developers/esvolta
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  4. ercotqueue.com/developer/skipper-energy-storage-llc

Commercial operation date: ERCOT's November 2024 capacity chart lists Skipjack with a 2027 COD, one year earlier than LBNL's 2028-02-28 filing date. This reflects a more current developer target.

Developer: LBNL filing uses project-LLC 'Skipper Energy Storage LLC'. Cleanview's esVolta pipeline page lists Skipjack Energy Storage as a 151 MW battery project in esVolta's development portfolio, indicating esVolta is the operating parent company.

Status: LBNL shows IA executed 2024-08-13. Texas PUC filings from September-October 2024 confirm ongoing interconnection documentation between CenterPoint/Oncor and Skipper Energy Storage LLC. ERCOT queue tracker notes FIS pending.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Skipjack Energy Storage is a proposed 150.6 MW battery storage project located in Brazoria County, Texas. The developer is Skipper Energy Storage LLC. The project is in the ERCOT interconnection queue as entry ERCOT-26INR0189, with a queue entry date of July 31, 2023, and a proposed commercial operation date of February 28, 2028. The interconnection agreement (IA) has been executed as of August 13, 2024.

The proposed project consists of 150.6 MW of battery storage capacity. Skipjack Energy Storage has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Skipper Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 42980 Nash - 44010 W A Parish ckt #2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.