Briefing/projectactive
Skipjack Energy Storage is a 151 MW Battery project in Texas, currently active.
Skipper Energy Storage LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-02-28.
- Queue ID
- ERCOT-26INR0189
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- Skipper Energy Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 42980 Nash - 44010 W A Parish ckt #2
What stands out
1
Skipjack Energy Storage is a 151 MW Battery project in Texas with status active.
2
Skipper Energy Storage LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-02-28.
Market and operating context
- Queue date
- 2023-07-31
- Proposed COD
- 2028-02-28
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.