Western Flats Storage (ERCOT-26INR0188) — Project Summary

Queue ID
ERCOT-26INR0188
Capacity
410.7 MW
Technology
Solar+Battery
Status
active
Location
Crane, TX
Region
ERCOT
Developer
Hecate Energy Point Mountain Solar Facility 1 LLC
IA Status
Facility Study

Western Flats Storage

ERCOT-26INR0188BetaActiveBatteryBatteryERCOTLBNL + Live

410.7 MW generation in Crane, TX · In queue since April 2024 · Proposed COD November 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

410.7 MW

Capacity

1

Components

Battery

2y 7m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

Facilities Study50%
Queue EntryApr 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-01

Queue history
26INR0188 · 20 monthly ERCOT reports, Feb 2025 – Sep 2026

Projected COD moved

0 times

Nov 2028 → Nov 2028

Net change

0 months

first report to latest

Capacity

411 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 9, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 1, 2028
From queue filing
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Point Mountain Solar Facility 1 LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. No public evidence of permitting, financing or construction.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/26INR0188/western-flats-storage
  2. infrasure.ai/project/ercot-26inr0188-western-flats-storage
  3. interconnection.fyi/project/ercot-26inr0188
  4. cleanview.co/planned-solar-projects/TX/26INR0110/western-flats-solar

Commercial operation date: The only specific date is the LBNL/ERCOT proposed COD of 2028-11-01. Cleanview's listings say 'Expected online 2028' and 'November 2028' for the sister Western Flats Solar project, but they look like mirrors of the queue data rather than independent developer signals. No press release or news article gives a financing-backed target.

Developer: The LBNL filing entity is a project-specific LLC whose name carries the 'Hecate Energy' brand, so the parent is inferred from the name alone. No retrieved source confirms the parent or any ownership change.

Status: LBNL lists the project as active at the Facility Study stage, and interconnection.fyi and Cleanview also show it as active or planned. No newer source contradicts this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Western Flats Storage (queue ID ERCOT-26INR0188) is a proposed energy development project in Crane County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The developer is listed as Hecate Energy Point Mountain Solar Facility 1 LLC. Although the queue classifies the project's technology as Solar+Battery, its only listed component is a 410.7 MW battery energy storage system, which accounts for the project's full 410.7 MW total capacity. The project is categorized as a generation project and would connect to the grid at a tap on the 138 kV Crane–King Mountain transmission line (buses 76615 and 76635).

The project entered the ERCOT interconnection queue on April 9, 2024, and holds active status. Its interconnection process is currently at the Facility Study stage, and it has not yet executed an interconnection agreement. The proposed commercial operation date is November 1, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Crane

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Point Mountain Solar Facility 1 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138 kV 76615 Crane -76635 King Mountain

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Crane East Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.