HyFuels Calhoun Solar
301.82 MW generation in Victoria, TX · In queue since October 2022 · Proposed COD October 2028
301.82 MW
Capacity
1
Components
Solar
4y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-07
Projected COD moved
2 times
Oct 2026 → Oct 2028
Net change
+24 months
first report to latest
Capacity
302 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
- 2024-04·BNB Renewables→Nova Clean Energybusinesswire.com
Milestones in this assessment
Nova Clean Energy closed its acquisition of the ~1 GW HyFuels wind and solar development portfolio on the TX Gulf Coast from BNB Renewables.
businesswire.comResearch sources and reasoning (6 recorded sources)
low confidence at research time
- businesswire.com/news/home/20240416489174/en/Nova-Clean-Energy-Closes-Acquisition-of-1-Gigawatt-Wind-and-Solar-Development-Asset-Portfolio-from-BNB-Renewables
- nsenergybusiness.com/deals/nova-clean-energy-acquires-1gw-hyfuels-renewable-energy-portfolio-from-bnb/
- infrasure.ai/project/ercot-26inr0028-hyfuels-calhoun-solar
- cleanview.co/power-projects/planned/solar-farms/texas/26INR0028/hyfuels-calhoun-solar
- interconnection.fyi/project/ercot-26inr0028
- ercotqueue.com/project/26INR0028
Commercial operation date: Infrasure lists 'Proposed COD: 2027-10-01' and Cleanview says 'Expected online 2027', while the LBNL snapshot (and interconnection.fyi) show 2028-10-07. Both 2027 signals look derived from queue data, not a developer press release, so the one-year shift is only moderately reliable.
Developer: Nova Clean Energy closed its April 2024 acquisition of the ~1 GW HyFuels Texas Gulf Coast wind and solar portfolio from BNB Renewables. The LBNL filing entity, HyFuels Green Lake Solar LLC, is a project shell from that portfolio, and Infrasure records the BNB-to-Nova transfer for this project. The press coverage does not name this specific project, so the link rests on the shared HyFuels name and Texas Gulf Coast location.
Status: LBNL shows 'active' and Infrasure confirms Facility Study with no IA executed. ercotqueue.com shows 'No IA' and a 16% build-chance. The 'operational' label on interxdata.com contradicts all other sources and was disregarded.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
HyFuels Calhoun Solar is a proposed solar generation project located in Victoria County, Texas, within the ERCOT region. The project, developed by HyFuels Green Lake Solar LLC, has a total capacity of 301.82 MW. It consists entirely of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as entry ERCOT-26INR0028, with a queue entry date of October 18, 2022. The proposed commercial operation date is October 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 8715 RADIANT7A - 8728 COBRA7A.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
HyFuels Green Lake Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8715 RADIANT7A - 8728 COBRA7A
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.