MESQUITE BESS (ERCOT-25INR0697) — Project Summary

Queue ID
ERCOT-25INR0697
Capacity
9.9 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Grenergy USA
IA Status
IA Executed

MESQUITE BESS

ERCOT-25INR0697BetaActiveBatteryERCOTLBNL

9.9 MW storage in Cameron, TX · Proposed COD February 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.9 MW

Capacity

1

Components

Battery

—

In Queue

IA Executed

IA Phase

Signed Feb 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

IA → COD

2 years

Schedule

10 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 26, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-02-16

Queue history
25INR0697 · 12 monthly ERCOT reports, Mar 2025 – Feb 2026

Projected COD moved

4 times

Nov 2025 → Feb 2026

Net change

+3 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Feb 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedFeb 26, 2024
Approved for energizationNov 25, 2025
Approved for synchronizationDec 17, 2025
Approved for commercial operationMar 5, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mesquite BESS is a proposed 9.9 MW battery energy storage development project in Cameron County, Texas. The project is being developed by Grenergy USA and is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under the identifier 25INR0697. It is a standalone storage project consisting of a single battery component rated at 9.9 MW.

The project's queue status is active. An interconnection agreement was executed on February 26, 2024, and the proposed commercial operation date is February 16, 2026. The designated point of interconnection is transformer 1 at the Mesquite substation, a 138 kV facility identified in ERCOT records under station code MESQUITE and bus number 8554. The project has been linked, with a match confidence of 0.92, to the Mesquite Clean Energy Center (BESS) in the U.S. Energy Information Administration's records (EIA plant ID 69457), associating the queue entry with an existing operating plant.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Feb 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Grenergy USA

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Substation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
MESQUITE_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.