MESQUITE BESS is a 10 MW Battery project in Texas, currently active.
Grenergy USA is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-02-16.
- Queue ID
- ERCOT-25INR0697
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- Grenergy USA
- Market / region
- ERCOT
- Point of interconnection
- Substation: Mesquite, XFMR 1 Substation transmission kV: 138 ERCOT Station Long Name: MESQUITE ERCOT Station site code: MESQUITE ERCOT Bus#: 8554 ERCOT Load Name: Load1
What stands out
1
MESQUITE BESS is a 10 MW Battery project in Texas with status active.
2
Grenergy USA is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-02-16.
Market and operating context
- Proposed COD
- 2026-02-16
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.