Slaton BESS (ERCOT-25INR0689) — Project Summary

Queue ID
ERCOT-25INR0689
Capacity
9.99 MW
Technology
Battery
Status
active
Location
—
Region
ERCOT
Developer
Prairie Dog BESS, LLC
IA Status
In Progress (unknown study)

Slaton BESS

ERCOT-25INR0689BetaActiveBatteryERCOTLBNL

9.99 MW storage in — · In queue since June 2025 · Proposed COD August 2025

ISO/RTO: ERCOT

9.99 MW

Capacity

1

Components

Battery

1y 5m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 months

Schedule

15 months past proposed COD

In Study38%
Queue EntryJun 12, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-08-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Slaton BESS is a proposed battery energy storage development project in the Electric Reliability Council of Texas (ERCOT) region, identified in the ERCOT interconnection queue as ERCOT-25INR0689. The project is being developed by Prairie Dog BESS, LLC and has a total proposed capacity of 9.99 MW, consisting entirely of battery storage. The project's point of interconnection is the Slaton Substation (station code LPLSL, bus number 59152) at a transmission-level voltage of 115 kV, associated with load transformer SLT1 and node SL15.

The project entered the ERCOT interconnection queue on June 12, 2025, and is listed with an active status. Its proposed commercial operation date is August 31, 2025. The interconnection agreement status is recorded as in progress, though the specific study phase has not been identified.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Prairie Dog BESS, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Station Name: Slaton Substation • Station Code: LPLSL • BUS #: 59152 • Transmission Level Voltage: 115 kV • Load/Load Transformer: SLT1 • Node (associated w/ load/load XFMR in NMMS): SL15

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.