Giga Texas Data Center
133 MW storage in Travis, TX · In queue since August 2024 · Proposed COD December 2025
133 MW
Capacity
1
Components
Battery
2y 3m
In Queue
IA Executed
IA Phase
Signed Apr 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
8 months
IA → COD
8 months
Total Duration
8 months
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2025-12-15
Projected COD moved
2 times
Apr 2025 → Dec 2025
Net change
+8 months
first report to latest
Capacity
133 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Proposed commercial operation date per LBNL queue filing
interconnection.fyiResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- interconnection.fyi/project/ercot-25inr0688
- cleanview.co/power-projects/developers/tesla
- ftp.puc.texas.gov/public/puct-info/industry/electric/reports/genplant/gentable.xls
Commercial operation date: LBNL queue filing shows proposed COD of December 15, 2025. No independent news sources discuss this specific project's timeline or construction status, so LBNL remains the sole authoritative source.
Developer: LBNL filing entity is 'Giga Texas Energy, LLC' which is a project-specific shell. The 'Giga Texas' naming convention and Cleanview pipeline listing under Tesla's developer profile strongly indicate this is a Tesla-owned battery storage project co-located with their Austin gigafactory campus.
Status: LBNL shows 'active' status with IA executed on April 30, 2025. No news coverage of construction milestones or delays, suggesting project remains on track but pre-construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Giga Texas Data Center project is a 133 MW battery storage development in Travis County, Texas. Developed by Giga Texas Energy, LLC, the project is located in the ERCOT region and entered the interconnection queue as ERCOT-25INR0688 on August 27, 2024. The proposed commercial operation date is December 15, 2025, and its interconnection status is currently in the Facility Study phase.
The project consists of 133 MW of battery storage. Interconnection will occur behind the meter at Medium Voltage 24.9 kV with non-export controls at the HORNSBY Substation. The project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Travis
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Giga Texas Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
HORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=XX%, 65DEG C RISE
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.