Giga Texas Data Center is a 133 MW Battery project in Texas, currently active.
Giga Texas Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-12-15.
- Queue ID
- ERCOT-25INR0688
- Location
- Travis, Texas
- Technology
- Battery
- Developer
- Giga Texas Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- HORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=XX%, 65DEG C RISE
What stands out
1
Giga Texas Data Center is a 133 MW Battery project in Texas with status active.
2
Giga Texas Energy, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2025-12-15.
Market and operating context
- Queue date
- 2024-08-27
- Proposed COD
- 2025-12-15
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.