Gilleys Energy Storage (ERCOT-25INR0656) — Project Summary

Queue ID
ERCOT-25INR0656
Capacity
306.4 MW
Technology
Battery
Status
active
Location
Wise, TX
Region
ERCOT
Developer
Gilleys Energy Storage, LLC
IA Status
Facility Study

Gilleys Energy Storage

ERCOT-25INR0656BetaActiveBatteryERCOTLBNL + Live

306.4 MW storage in Wise, TX · In queue since June 2024 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

306.4 MW

Capacity

1

Components

Battery

2y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Facilities Study50%
Queue EntryJun 3, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-21

Queue history
25INR0656 · 29 monthly ERCOT reports, May 2024 – Sep 2026

Projected COD moved

1 time

Dec 2025 → Apr 2028

Net change

+28 months

first report to latest

Capacity

306 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 3, 2024
Facilities study approvedJan 5, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 21, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no IA date, and no construction or financing announcements found. Oncor filings at the Texas PUC (Jan 2026) name the entity, which suggests continued interconnection activity.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/state/TX
  2. quicksandcheck.com/texas/wise-county/
  3. infrasure.ai/ask/r/gilleys-energy-storage
  4. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  5. texas-biz.com/co/gilleys-energy-storage-llc

Commercial operation date: Only the LBNL/ERCOT queue date of 2028-04-21 exists; the aggregator listing (quicksandcheck.com, 'Apr 2028') repeats the same queue data rather than providing an independent developer-backed target. No press release or news gives a different COD.

Developer: All sources list only the project LLC as developer. Bizapedia and texas-biz show it as a foreign LLC registered in Texas in Jan 2026, but no parent or operating company is named.

Status: LBNL lists the project as active and the ERCOT queue aggregators (interconnection.fyi, infrasure) agree. No evidence of withdrawal, construction start, or an executed IA.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Gilleys Energy Storage project is a proposed 306.4 MW battery storage facility in Wise County, Texas. The project, developed by Gilleys Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0656, with a queue entry date of June 3, 2024. The proposed commercial operation date is April 21, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for the project is Tap 345 kV 1730 West Krum - 6111 Riley CKT 2. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wise

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gilleys Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1730 West Krum - 6111 Riley CKT 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HMNG_ESS_RN
POI Substation
West Krum Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.