Gilleys Energy Storage
Type
Entity Briefing
Entity
Gilleys Energy Storage
Technology
battery
Generated
2026-10-19T18:49:21.212Z

Briefing on Gilleys Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-21
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Gilleys Energy Storage is a 306 MW Battery project in Texas, currently active.

Gilleys Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-21.

Queue ID
ERCOT-25INR0656
Location
Wise, Texas
Technology
Battery
Developer
Gilleys Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 1730 West Krum - 6111 Riley CKT 2

What stands out

1

Gilleys Energy Storage is a 306 MW Battery project in Texas with status active.

2

Gilleys Energy Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-21.

Market and operating context

Queue date
2024-06-03
Proposed COD
2028-04-21
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gilleys Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0656
LocationWise, Texas
TechnologyBattery
DeveloperGilleys Energy Storage, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 1730 West Krum - 6111 Riley CKT 2
Queue date2024-06-03
Proposed COD2028-04-21