East Harrison BESS (ERCOT-25INR0648) — Project Summary

Queue ID
ERCOT-25INR0648
Capacity
9.99 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Aggreko MSR Grid PC5
IA Status
IA Executed

East Harrison BESS

ERCOT-25INR0648BetaActiveBatteryERCOTLBNL

9.99 MW storage in Cameron, TX · Proposed COD January 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

9.99 MW

Capacity

1

Components

Battery

—

In Queue

IA Executed

IA Phase

Signed Mar 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

IA → COD

1y 10m

Schedule

11 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 17, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-01-03

Queue history
25INR0648 · 14 monthly ERCOT reports, Feb 2025 – Mar 2026

Projected COD moved

4 times

Aug 2025 → Feb 2026

Net change

+6 months

first report to latest

Capacity

10 MW

unchanged in the reports

Latest stage

Commercial operation

last listed Mar 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedMar 17, 2024
Approved for energizationSep 3, 2025
Approved for synchronizationNov 12, 2025
Approved for commercial operationApr 21, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

East Harrison BESS is a proposed battery energy storage development project located in Cameron County, Texas. Developed by Aggreko MSR Grid PC5, the project has a total proposed capacity of 9.99 MW, consisting entirely of a single battery storage component. It is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue identifier ERCOT-25INR0648, and its status is active.

The project's planned point of interconnection is the E_HARRIS station at the 69 kV voltage level, associated with load transformer 69_12_1 and bus number 8323. An interconnection agreement (IA) for the project was executed on March 17, 2024. The proposed commercial operation date is January 3, 2026.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Mar 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Aggreko MSR Grid PC5

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Station Name: E_HARRIS Load Name or Load Transformer name: 69_12_1 Bus#: 8323 Voltage: 69kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.