Briefing/projectactive
East Harrison BESS is a 10 MW Battery project in Texas, currently active.
Aggreko MSR Grid PC5 is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-03.
- Queue ID
- ERCOT-25INR0648
- Location
- Cameron, Texas
- Technology
- Battery
- Developer
- Aggreko MSR Grid PC5
- Market / region
- ERCOT
- Point of interconnection
- Station Name: E_HARRIS Load Name or Load Transformer name: 69_12_1 Bus#: 8323 Voltage: 69kV
What stands out
1
East Harrison BESS is a 10 MW Battery project in Texas with status active.
2
Aggreko MSR Grid PC5 is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-01-03.
Market and operating context
- Proposed COD
- 2026-01-03
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.