Turkey Creek Solar SLF (ERCOT-25INR0622) — Project Summary

Queue ID
ERCOT-25INR0622
Capacity
180.9 MW
Technology
Solar+Battery
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
Greenray Solar Corporation
IA Status
Facility Study

Turkey Creek Solar SLF

ERCOT-25INR0622BetaActiveSolarBatteryERCOTLBNL + Live

180.9 MW hybrid in Kinney, TX · In queue since February 2024 · Proposed COD October 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

180.9 MW

Capacity

1

Components

Solar

2y 5m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 8m

Facilities Study50%
Queue EntryFeb 26, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-26

Cross-source intelligence
Beta
Low confidence·7 sources·as of 2026-06-01
Expected COD
Oct 2027
From queue filing
Developer
Greenray Solar Corporation
From queue filing
Status
Active
Active — Facility Study stage per LBNL; ercotqueue.com lists as 'Construction' with 95% build-chance but this appears to be algorithmic projection rather than confirmed ground-breaking
Financing
Unannounced
About

The Turkey Creek Solar project is a proposed 211.2 MW solar generation facility in Kinney County, Texas. The project, being developed by Greenray Solar Corporation, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0622, with a queue entry date of February 26, 2024. The proposed commercial operation date is October 26, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 211.2 MW of solar photovoltaic generation. The point of interconnection is the 7425 ODLASW 138kV substation. The Turkey Creek Solar project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greenray Solar Corporation

Utility

Entity

ERCOT

Service Type

Point of Interconnection

7425 ODLASW 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Turkey Creek Solar SLF
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.