McCamey's Castle Battery (ERCOT-25INR0557) — Project Summary

Queue ID
ERCOT-25INR0557
Capacity
409.6 MW
Technology
Battery
Status
active
Location
Upton, TX
Region
ERCOT
Developer
Castle Storage, LLC
IA Status
IA Executed

McCamey's Castle Battery

ERCOT-25INR0557BetaActiveBatteryERCOTLBNL + Live

409.6 MW storage in Upton, TX · In queue since October 2023 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

409.6 MW

Capacity

1

Components

Battery

3y 1m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 5m

IA → COD

3 years

Total Duration

1y 5m

Construction75%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 20, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-03-30

Queue history
25INR0557 · 35 monthly ERCOT reports, Oct 2023 – Sep 2026

Projected COD moved

4 times

Dec 2025 → Mar 2028

Net change

+27 months

first report to latest

Capacity

410 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 13, 2023
Interconnection agreement signedMar 20, 2025
On ERCOT's inactive listNov 2025 – Nov 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 30, 2028
Developer in saved assessment
Akaysha Energy
Filed as Castle Storage, LLC
Status at research time
IA Executed
Active in the ERCOT queue with IA executed March 2025. Akaysha schedules construction start for November 2026, so the project is not yet under construction. The public page describes 250 MW / 500 MWh versus 409.6 MW in the queue.
Financing
Not recorded

Milestones in this assessment

IA executedMar 2025

Interconnection agreement signed March 2025 (LBNL IA date 2025-03-20).

infrasure.ai
COD target2028Latest in this assessment

Akaysha targets commercial operations in Q1 2028, with construction scheduled to begin November 2026.

community.akayshaenergy.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. community.akayshaenergy.com/castle-bess
  2. mccameyhospital.org/wp-content/uploads/2024/10/AugustCastle.pdf
  3. infrasure.ai/project/ercot-25inr0557-mccamey-s-castle-battery
  4. interconnection.fyi/project/ercot-25inr0557
  5. ercotqueue.com/project/25INR0557

Commercial operation date: Akaysha's project page says 'commercial operations targeted for the first quarter of 2028', which matches the LBNL proposed COD of 2028-03-30. The day-level date comes from LBNL. One aggregator (infrasure) also shows a stray 2027-03-31 date, but that is inconsistent with its own header and is disregarded.

Developer: Akaysha's community page for 'Castle BESS' describes the same site near McCamey, adjacent to the Robbins Switch 138 kV substation, which is the LBNL point of interconnection. A McCamey Hospital District notice names Castle Storage, LLC as the project entity, so the LLC appears to be Akaysha's project vehicle.

Status: LBNL shows IA Executed and active, and Akaysha's page says construction is still scheduled to start in November 2026. The ercotqueue 'Construction' label looks premature, and interxdata's 'operational' is contradicted by the other sources.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The McCamey's Castle Battery project is a proposed 409.6 MW battery storage project located in Upton County, Texas. Developed by Castle Storage, LLC, the project entered the ERCOT interconnection queue as entry ERCOT-25INR0557 on October 13, 2023. The current interconnection status is listed as Facility Study, with a proposed commercial operation date of March 31, 2027.

The project consists of 409.6 MW of battery capacity. It is currently listed as an active project within the ERCOT queue. The point of interconnection is the 76597 Robbins Switch 138 kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Upton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Castle Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

76597 Robbins Switch 138 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.