Stargazer Solar (ERCOT-25INR0555) — Project Summary

Queue ID
ERCOT-25INR0555
Capacity
157.7 MW
Technology
Solar+Battery
Status
suspended
Location
Brazoria, TX
Region
ERCOT
Developer
Stargazer Solar LLC
IA Status
Facility Study

Stargazer Solar

ERCOT-25INR0555BetaSuspendedSolarBatteryERCOTLBNL + Live

157.7 MW hybrid in Brazoria, TX · In queue since October 2023 · Proposed COD February 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

157.7 MW

Capacity

1

Components

Solar

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 4m

Suspended50%
Queue EntryOct 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-02-01

Queue history
25INR0555 · 35 monthly ERCOT reports, Oct 2023 – Aug 2026

Projected COD moved

1 time

Dec 2025 → Feb 2027

Net change

+14 months

first report to latest

Capacity

158 MW

unchanged in the reports

Latest stage

Facilities study done

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 30, 2023
Facilities study approvedMar 27, 2026
On ERCOT's inactive listSep 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Feb 1, 2027
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — Facility Study stage per LBNL queue, no public construction or financing announcements
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-25inr0555
  2. cleanview.co/planned-solar-projects/TX/25INR0555/stargazer-solar
  3. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
  4. americas.rwe.com/our-energy/solar-energy/solar-projects-and-locations/stargazer-solar/
  5. protectmckeancountywilds.com/rwe-stargazer.html

Commercial operation date: LBNL queue snapshot proposes February 2027 COD. No independent news sources confirm or update this target for the Texas project; Cleanview aggregator echoes January 2027 but appears derivative of LBNL data.

Developer: LBNL filing entity is 'Stargazer Solar LLC', a project-specific shell. No press releases, corporate announcements, or news coverage identify the parent operating company or developer behind this Texas project. Note: RWE operates a separate 'Stargazer Solar' project in Pennsylvania (McKean County, 480 MW) with no evidence linking it to this ERCOT queue entry.

Status: LBNL status is 'active' with IA status at 'Facility Study'. No news coverage of this specific Texas project exists to contradict or enrich this baseline status.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Stargazer Solar is a proposed hybrid solar and battery storage development project in Brazoria County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Stargazer Solar LLC and has a total proposed capacity of 157.7 MW. The listed components specify 157.7 MW of solar generation. Battery storage is identified as part of the project's technology, but no separate battery capacity is provided. The project is planned to connect to the grid at the 44010 WA Parish – 42980 Nash 138 kV Circuit 02 transmission line.

The project entered the ERCOT interconnection queue on October 30, 2023, under queue ID ERCOT-25INR0555. Its proposed commercial operation date is February 1, 2027. The project's interconnection agreement status is listed as being in the Facility Study phase. Its overall queue status is currently recorded as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Stargazer Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44010 WA Parish - 42980 Nash 138 kV Ckt 02

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.