CPS Energy AvR1CT2 Rotor Replacement (ERCOT-25INR0531) — Project Summary

Queue ID
ERCOT-25INR0531
Capacity
23.2 MW
Technology
Gas
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
CPS Energy
IA Status
Facility Study

CPS Energy AvR1CT2 Rotor Replacement

ERCOT-25INR0531BetaActiveGasERCOTLBNL + Live

23.2 MW generation in Bexar, TX · In queue since October 2023 · Proposed COD August 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

23.2 MW

Capacity

1

Components

Gas

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 10m

Schedule

3 months past proposed COD

Facilities Study50%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-08-14

Queue history
25INR0531 · 32 monthly ERCOT reports, Feb 2024 – Sep 2026

Projected COD moved

9 times

Feb 2025 → Aug 2026

Net change

+18 months

first report to latest

Capacity

11 → 23 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 13, 2023
Facilities study approvedApr 25, 2024
Approved for synchronizationNov 22, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The CPS Energy AvR1CT2 Rotor Replacement is a proposed 23.2 MW gas-fired generation project located in Bexar County, Texas. Developed by CPS Energy, the project is interconnected within the ERCOT region under queue ID ERCOT-25INR0531, with an interconnection queue entry date of October 13, 2023. The proposed commercial operation date is March 28, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.

The project is linked to the existing CPS Energy Braunig plant at the 5475 Braunig 345kV point of interconnection. Recent news coverage has discussed the project's progress and potential impact on the regional energy grid.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CPS Energy

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5475 Braunig 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BRA_AVR1_CT2
POI Substation
Braunig Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.