Query
CPS AvR CT1 Rotor Replacement
Type
Entity Briefing
Entity
CPS Energy AvR1CT2 Rotor Replacement
Generated
2026-10-19T18:09:59.256Z

Briefing on CPS Energy AvR1CT2 Rotor Replacement

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
23 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2026-03-28
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

CPS Energy AvR1CT2 Rotor Replacement is a 23 MW Gas project in Texas, currently active.

CPS Energy is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-03-28.

Queue ID
ERCOT-25INR0531
Location
Bexar, Texas
Technology
Gas
Developer
CPS Energy
Market / region
ERCOT
Point of interconnection
5475 Braunig 345kV

What stands out

1

CPS Energy AvR1CT2 Rotor Replacement is a 23 MW Gas project in Texas with status active.

2

CPS Energy is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-03-28.

Market and operating context

Queue date
2023-10-13
Proposed COD
2026-03-28
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

CPS Energy AvR1CT2 Rotor Replacement — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0531
LocationBexar, Texas
TechnologyGas
DeveloperCPS Energy
Market / regionERCOT
Point of interconnection5475 Braunig 345kV
Queue date2023-10-13
Proposed COD2026-03-28